Network Wiring & Low Voltage

Plan the network before the walls are opened.

Strong network design starts long before installation — mapping rooms, devices, bandwidth needs, cable runs, switch locations, PoE requirements, and future expansion.

01

Ethernet drops and cable path planning

We map every room and device, decide what runs to the closet, and document path lengths so contractors can quote with confidence.

02

Cat6, Cat6A, and fiber consultation

Picking the right cable for the run, the speed target, and the next five to ten years — without over-spending on copper you'll never saturate.

03

IDF / MDF and rack layout advisory

Patch panels, switches, PoE budgets, and rack thermal/airflow planning so the closet stays serviceable as the network grows.

04

Wi-Fi and wired hybrid design

  • Access-point placement and PoE feeds
  • SSID and VLAN strategy
  • Roaming and channel planning
  • Wired-first vs mesh trade-offs
05

Smart cameras, access points, and low-voltage devices

Camera coverage, sensor placement, and PoE-powered devices planned alongside the data network, not retrofitted onto it.

06

Contractor coordination

We produce documentation contractors can bid against — cable schedules, faceplate maps, rack elevations, and labeling conventions.